Here's what Site Docs AI produced from one short description of a job. This is the real structure — hazards, who might be harmed, controls, residual ratings and method steps in working order.
One short description
No forms, no dropdowns, no health and safety jargon. Just plain English, the way you'd explain it to a mate.
Job description
“Excavating trenches for a foul drainage run at a new-build housing site. Four operatives, 360 excavator on hire, work is beside a public footpath. Site has existing services marked. Two days on site.”
Risk Assessment
Rev 1.0 · Trenches — foul drainage · 4 operatives
| Hazard | Who might be harmed | Control measures | Residual |
|---|---|---|---|
| Excavation collapse | Operatives in trench, groundworkers | Batter or shore trench sides to 45°. Daily inspection before entry. No entry below 1.2m unsupported. Spoil stored 1m back from edge. | Low |
| Striking buried services | Operatives, plant operator, wider site | CAT scan of each run before breaking ground. Hand-dig trial holes to confirm service positions. Services marked and isolated where possible. | Low |
| Plant / pedestrian interface | Public footpath users, operatives | Excavator segregated from footpath with rigid barriers. Slinger banksman controls all machine movements. Plant reversals escorted. | Medium |
| Manual handling — pipe sections | Operatives installing drainage | Mechanical lift for all sections over 20kg. Team lift technique where manual handling unavoidable. Gloves and safety boots issued. | Low |
| Slips, trips and falls | Operatives, visitors to the work area | Materials stockpiled off walkways. Walkways clear and gravel-bedded. Work area lighting in low light. Exclusion zone maintained. | Low |

Method Statement
In the order the work will really happen
- 01
Site set-up and briefing. Establish the work area, position rigid barriers between the excavation and the public footpath, and brief all operatives on this method statement and the risk assessment. Confirm the location of the nearest A&E and first-aid arrangements.
- 02
Service location. Scan each trench line with a CAT and signal generator. Mark all detected services on the ground in paint. Hand-dig trial holes to positively confirm position and depth before any machine excavation within 1m of a marked service.
- 03
Excavate the trench. Machine-excavate using the 360 excavator under banksman control. Batter or shore the sides as excavation proceeds. Store spoil a minimum of 1m back from the trench edge. Do not allow operatives into unsupported trenches deeper than 1.2m.
- 04
Inspect and prepare the trench. Inspect the trench before each shift and after any event likely to affect stability. Confirm the formation level and remove any loose material. Keep the trench free of standing water.
- 05
Lay the drainage. Lower pipe sections mechanically where they exceed 20kg. Bed and align to the required fall. Joint pipework to the manufacturer's instructions and protect with granular surround.
- 06
Backfill and compact. Backfill in layers, compacting each layer to the specified density. Remove the barriers and reinstate the footpath surface. Leave the site clean and hand over to the main contractor.
PPE and equipment
- Hard hat (EN 397)
- Safety boots with midsole protection
- Hi-vis vest or jacket, Class 2 minimum
- Cut-resistant gloves for pipe handling
- Safety glasses when cutting or breaking
- Hearing protection within 5m of the excavator
Emergency arrangements
- First aider on site: named in the briefing
- Nearest A&E: confirmed at set-up and displayed in the site office
- Emergency contact: site manager, number displayed
- Stop-work authority: any operative may stop work on unsafe ground
- Buried service strike: evacuate, do not switch anything, call 105
Sign-off area
Prepared by
Reviewed by
Site manager
Date